Ask most solar installers how their marketing is going and you get one number back: cost per lead. It is the number lead sellers quote, the number ad platforms show first, and the number agencies love when it is low. It is also the number least connected to whether you make money.
This post is about solar and battery jobs specifically: where a cheap cost per lead comes from, why solar's long survey-to-install gap makes it easy to fool yourself, and the handful of numbers to watch instead. The general method of tracking every lead to a sale across all channels is covered in which marketing actually makes you money. Here we focus on what is different about solar.
Where a cheap solar lead comes from
It is easy to halve a cost per lead. You just make the form easier to fill in and the promise bigger. In solar that usually looks like:
- "Free" or "grant" hooks. Ads that hint panels might be free, or that lean on scheme names, pull in people who drop out the moment a price appears.
- No ownership question. Renters and flat dwellers fill in solar forms all the time. They cannot say yes.
- No roof question. North-facing, heavily shaded or listed roofs are surveys you should never book.
- Instant forms with no friction. Pre-filled lead forms produce lots of names and plenty of people who do not remember enquiring.
- Broad targeting. Ads shown to everyone in a region rather than to homeowners in the postcodes you actually cover.
Each of these lowers cost per lead and raises cost per install. Your rep feels it before your spreadsheet does: more no-answers, more "I was just curious", more surveys at houses that were never going to work.
Why solar makes cost per lead especially misleading
The gap between enquiry and install
A solar enquiry today might be surveyed next week, designed and quoted the week after, then installed a month or more later once scaffolding, kit and any network operator approval are lined up. Battery additions are often quicker, full systems slower. So the installs you complete this month mostly came from last month's leads, or the month before.
If you compare this month's ad spend with this month's installs, you will draw the wrong conclusion every time spend changes. The fix is cohort reporting: take every lead from a given month and follow it until it either installs or dies.
Jobs are not all the same size
A panels-only job, a panels-plus-battery job and a battery retrofit on an existing system are very different sales. A campaign that produces lots of cheap battery-only enquiries might look brilliant on cost per lead and still produce less profit than one that produces fewer full systems. Track job value, not just job count.
Cancellations happen late
Solar deals can fall over after the deposit: finance declined, roof needs work first, a partner gets cold feet, the design changes. If you count a sale at deposit but never subtract the cancellations, your cost per sale looks better than it is. Finance is a common one: lenders run their own credit and affordability checks, including on Warm Homes loans, so a signed customer is not an installed customer until the finance is approved.
The numbers to track instead
You do not need fifty metrics. You need these, by lead source and by month of enquiry:
| Number | What it tells you |
|---|---|
| Cost per booked survey | Whether the ads and the qualifying are working |
| Survey sit rate (surveys that happen) | Whether leads are real and reminders work |
| Cost per sale (signed, deposit taken) | Whether the leads are buyers |
| Cancellation rate after sale | Whether you are selling to people who can actually proceed |
| Cost per install | The number that matters |
| Average job value | Whether you are attracting full systems or small add-ons |
| Marketing cost as a share of job value | Whether the whole thing is profitable |
Cost per booked survey is your early warning. It shows up within a couple of weeks, long before installs do. If it is rising, look at the ad and the form. If cost per survey is fine but cost per sale is not, look at the sales process, the quote and the follow-up rather than the ads.
A weekly solar scorecard
Every Monday, one page, five minutes:
- Leads in last week, by source.
- Surveys booked and surveys sat, by source.
- Proposals sent, sales signed, value signed.
- Cancellations and why.
- Installs completed, with the month each one first enquired.
- Rolling 90-day cost per survey and cost per install, by source.
If you cannot fill in that page in five minutes, your CRM is not set up to answer the question, and your marketing decisions are guesswork. This is exactly what Installer Flow reporting is built for: every number from ad to install, pulled from the CRM rather than from the ad platform.
What a sensible cost per lead looks like
We get asked this a lot, so here is the honest answer. Across our live Meta accounts, the spend-weighted average cost per lead is £19.41, and it runs from £11.90 to £36.56 depending on service, area and how tight the qualifying is. That figure covers several trades, not just solar, so treat it as context, not a target.
The number that tells you more is cost per sale against job value. Pure Volts grew from 3 installs a week to 10 a week while, in Ali's words, staying "still within that three to five hundred pound cost per sale". Their cost per lead was never the headline. The cost per sale was.
How to change the conversation with your agency or lead seller
If someone is selling you solar leads or running your ads, ask them to report on:
- Surveys booked and sat, not just leads.
- Sales and installs by the month of enquiry.
- Which ads and which form answers produce installs, not just clicks.
If they cannot see your sales data, they cannot optimise for it. That means connecting your CRM back to the ad platforms so Meta and Google learn from booked surveys and sales, not from form fills. If they will not report on installs at all, you have your answer.
For a deeper look at what this means for bought leads specifically, see shared vs exclusive solar leads. For how we run campaigns for solar and battery installers, see our solar and battery lead generation page.
Want to know your real cost per install?
Book a free video call with Tom. Bring your last three months of spend and installs, and we will help you work out what each install is really costing you, where the leak is, and whether your area is open.
Sources
Questions owners ask
What is a good cost per lead for solar in the UK?
There is no useful single number, because it depends on area, offer and how hard the form qualifies. Across our live Meta accounts the spend-weighted average is £19.41, ranging from £11.90 to £36.56, and that covers several trades, not just solar. Judge your campaign on cost per install against your margin instead.
How long should I wait before judging a solar campaign?
Look at cost per booked survey after two to three weeks, because that shows up quickly. Cost per install takes longer, because solar and battery jobs often take weeks to move from survey to installation. Judge each month's leads by the installs they eventually produce, not by what was installed that month.


